This time we really had our hands full. The customer needed a new refreshment stand outside the Kaufland in Benešov as fast as possible, asking whether we could deliver everything by the end of August.
We handed over the finished module on 7 August — the whole project took just 4 weeks from brief to delivery. The customer had a unit ready to earn even sooner than expected.
What we delivered
- Air conditioning
- 10× 230V socket
- 2× 380V socket for gastro equipment
- Large service windows with sliding opening
- Reinforced floor structure
- Outdoor Kanlux lighting
- Full transport and handover of a finished unit
Quality build for everyday operation
- Fully welded steel frame
- Walls: 100 mm PIR
- Floor: 100 mm PIR + OSB + SPC vinyl
- Roof: 100 mm PIR
- Heat-transfer coefficient U = 0.24 W/m²K
- Aluminium Hormann windows and doors with insulated double glazing
We put as much care into the look as into the technical side. The combination of anthracite RAL 7016 and façade cassettes in dark-walnut décor feels modern and representative — and works beautifully even in a busy commercial setting.
Project price
354,000 CZK + VAT










